BETHESDA, MD, 20814 · Montgomery County
Building permit — commercial building
Interior work only,MINOR NON-STRUCTURAL INTERIOR ALTERATION WITHIN AN EXISTING, FULLY CONDITIONED GROUP B CORPORATE OFFICE SUITE. CREATE A SINGLE DEDICATED CONFERENCE ROOM.
Building permit — commercial building
AT&T Wireless proposes to remove fourteen (14) existing antennas, six (6) TMAs, six (6) combiners, and sixteen (16) RRHs at the building site. AT&T Wireless proposes to add eight (8) new antennas, four (4) diplexers, and sixteen (16) new RRHs at the building site. AT&T Wireless proposes to remove one (1) existing cabinet on the main roof level
Building permit — commercial building
Revision 1,1 - Update the permission of the permit. Vantage Construction Corporation,Customer Wants To Use ePlansCustomer Wants To Use ePlans,LEVEL 1 alteration to an existing commercial building lobby. Interior and exterior finish refreshments, localized repairs and decorative upgrades.
Building permit — commercial building
THE SCOPE OF WORK REPRESENTED ON THESE DRAWINGS HAS BEEN PROVIDED IN ORDER TO CONSTRUCT 12,274 SF. GC TO FURNISH LABOR, MATERIALS, TOOLS, EQUIPMENT, AND SERVICES FOR WORK AS INDICATED OR INFERRED BY THE DOCUMENTS TO COMPLETE TO DESIGN INTENT. GC SHALL COMPLETELY COORDINATE WORK AND SHALL ASSUME THE BURDEN OF ADDITIONAL COST IF SEQUENCING RESULTS IN WORK HAVING TO BE REMOVED OR IF HIS COSTS INCREASE BECAUSE OF POOR SEQUENCING OF WORK. CONTRACTOR RESPONSIBLE FOR INCIDENTAL LOCAL JURISDICTION'S INTERPRETATIONS OF INTERNATIONAL BUILDING CODE. TENANT WORK TO BE PROVIDED UNDER SEPARATE SUBMISSION.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.