WASHINGTON, DC 20016 · DC — Ward 3
Building permit — alteration and repair
Revision to permit B2601030:Changes to layout of second floor only. No edits to first floor, cellar, or building footprint/massing.
Applicant: ADAM CRAIN · Owner: 4721 45TH STREET NW LLC
Building permit — mechanical
Owner: 4721 45TH STREET NW LLC
Building permit — electrical
Owner: 4721 45TH STREET NW LLC
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: RAUL PEDRO ORELLANA SUICA · Owner: 4721 45TH STREET NW LLC
Building permit — electrical
Owner: 4721 45TH STREET NW LLC
Building permit — plumbing and gas
Owner: 4721 45TH STREET NW LLC
Building permit — addition alteration repair
Third floor and rear addition to existing detached single family house. No change of use. Sprinklers system to be installed. Rear deck, fence at property perimeter entirely on the subject property. Proposed gross floor area 3,777 SF
Applicant: ADAM CRAIN · Owner: 4721 45TH STREET NW LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.