WASHINGTON, DC 20019 · DC — Ward 7
Building permit — electrical
Owner: FIRST BAPTIST CHURCH
Building permit — fence
INSTALLATION OF FENCE TOTAL HEIGHT: 6 FEET (72 INCHES) ABOVE FINISHED GRADE. FABRIC: 2-INCH DIAMOND MESH, 9-GAUGE ALUMINIZED OR GALVANIZED STEEL. TERMINAL POSTS (CORNERS/ENDS): 2 7/8" OD (OUTER DIAMETER) SCHEDULE 40 STEEL. LINE POSTS: 2 3/8" OD SCHEDULE 40 STEEL, SPACED EVERY 10 FEET MAXIMUM. TOP RAIL: 1 5/8" OD SCHEDULE 40 STEEL, CONTINUOUS THROUGH LINE POST CAPS.
Applicant: NICK HAYES · Owner: FIRST BAPTIST CHURCH
Building permit — solar system
Revision to permit SOL2504376 Racking (Attachment Type) change from AEROCOMPACT COMPACT GROUND G20 to SUNBALLAST SINGLE-ROW 20 DEGREES; Module Type change from? JA SOLAR JAM72D30-550/MB to VSUN SOLAR VSUN595N-144BMH-DG; Change from (2) SOLAR EDGE SE100KUS (277/480V) to (4) SOLAR EDGE SE50KUS (208V); Change from a 300amp 480v 3 phase connection to a 700 amp 208v 3 phase connection.
Applicant: NICK HAYES · Owner: FIRST BAPTIST CHURCH
Building permit — electrical
Owner: FIRST BAPTIST CHURCH
Building permit — electrical
Owner: FIRST BAPTIST CHURCH
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.