WASHINGTON, DC 20001 · DC — Ward 2
Building permit — alteration and repair
Historic Revision to B2301285 for missed Elevator review only. Wheelchair lift on first floor needs to be reviewed.
Applicant: OLUSOLA PYNE · Owner: DISTRICT OF COLUMBIA
Building permit — alteration and repair
HISTORIC REVISION TO B2301285 FOR THE RENOVATION AND FITOUT OF EARLY 1940s SINGLE STRUCTURE AT 501 NEW YORK AVENUE NW, TO RELOCATE DC DEPARTMENT OF CORRECTIONS CENTRAL BOOKING. THE SCOPE OF WORK FOR THIS PHASE INCLUDES THE REDUCTIONS OF CURB CUTS ON BOTH L STREET NW AND NEW YORK AVE NW, AND RELATED UPDATES TO PARKING LAYOUT, AS WELL AS THE CONSTRUCTION OF A NEW SITE PERIMETER FENCE WITH VEHICULAR AND PEDESTRIAN ACCESS GATES. INTERIOR UPDATES INCLUDE ADDING ACOUSTIC PANELS AND WINDOW FILM TO THE TIER SPACE.
Applicant: OLUSOLA PYNE · Owner: DISTRICT OF COLUMBIA
Building permit — electrical
Owner: DISTRICT OF COLUMBIA
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: SAMUEL JONES · Owner: DISTRICT OF COLUMBIA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.