WASHINGTON, DC 20003 · DC — Ward 6
Building permit — electrical
Owner: LYON, REGAN F
Building permit — plumbing and gas
Owner: LYON, REGAN F
Building permit — alteration and repair
HISTORIC RENOVATING 1ST AND 2ND FLOORS, INCLUDING MOVING 1ST FLOOR KITCHEN, ADDING 1/2 BATHROOM, AND MOVING 2ND FLOOR BATHROOMS. REMOVING TWO CHIMNEYS FROM CELLAR THROUGH ROOF. ENLARGING STAIRS FROM 1ST TO 2ND FLOOR TO MAKE CODE COMPLIANT. INTERIOR WORK ONLY
Applicant: GAY HARDWICK · Owner: TAYLOR, REYNOLDS
Building permit — demolition
Removing interior walls, built-ins, floors, kitchen cabinets, bathroom fixtures.
Applicant: REGAN LYON · Owner: TAYLOR, REYNOLDS
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.