WASHINGTON, DC 20003 · DC — Ward 8
Building permit — electrical
Electrical Trade Permit
Applicant: MIGUEL GUTIERREZ · Owner: 55M DC OWNER LLC
Building permit — alteration and repair
Install (4) level 2 EV chargers on level P1 of parking garage and (2) level 2 EV charger locations planned for the future. Install 480v, 3P, 100amp breakers. Install 600v, 3P, 100amp disconnects. Install 480v, 3P, 120/208v, 75kVA transformer. Install 120/208v, 3P, 200 amp panelboard. Install (2) new 2P, 60amp breakers in EV charger panel. Relabel panel schedule per plans. Ground per code.
Applicant: JESSICA MILLIGAN · Owner: 55M DC OWNER LLC
Building permit — electrical
Owner: 55M DC OWNER LLC
Building permit — electrical
Owner: 55M DC OWNER LLC
Building permit — electrical
Owner: 55M DC OWNER LLC
Building permit — alteration and repair
Revision to Issued Permit B2601953. Electrical work only
Applicant: JASON BENTLEY · Owner: 55M DC OWNER LLC
Building permit — alteration and repair
Demising wall on the 3rd floor.
Applicant: JASON BENTLEY · Owner: 55M DC OWNER LLC
Building permit — plumbing and gas
Owner: 55M DC OWNER LLC
Building permit — plumbing and gas
Owner: 55M DC OWNER LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.