WASHINGTON, DC 20011 · DC — Ward 4
Building permit — alteration and repair
NO CHANGE TO SCOPE OF WORK TO B2601679, PPERMIT REVISION TO HAVE THE ROLL UP GATE 10' FROM THE ALLEY, INSTEAD OF 5' PREVIOUSLY APPROVED.
Applicant: X CASE · Owner: HSIEH, MICHAEL
Building permit — fence
RELOCATE FENCE CLOSER TO PARTY LINE AND INSTALL NEW ROLL OUT GATE
Applicant: X CASE
Building permit — alteration and repair
REPLACE EXISTING DRIVEWAY, REINSTALL FENCE AND INSTALL NEW ROLL OUT GATE.ALL EXTERIOR WORK- NO PLUMBING, MECHANICAL, ENERGY AND DC WATER.
Applicant: X CASE
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.