ROCKVILLE, MD, 20852 · Montgomery County
Building permit — commercial building
Replace existing indoor water slide at Kennedy-Shriver Aquatic Center
Right-of-way permit — public right of way
INSTALL GAS SERVICE. Work shall comply with Montgomery County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). All lane closures/traffic controls shall comply with approved Traffic Control Plans, Work Zone Temporary Traffic Control Standards and directions of the DPS ROW Inspector. Must have preconstruction meeting with DPS ROW inspector prior to beginning construction work.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.