All permits

600 H ST NE

WASHINGTON, DC 20002 · DC — Ward 6

Permit activity

Mar 2026 → Aug 2026
  1. Building permit issuedMar 6
  2. Building permit issuedJun 2
  3. Building permit issuedJun 3
  4. Building permit issuedJul 14
  5. Building permit issuedAug 28
DC-HO2600865
PERMIT ISSUED

Building permitna

undefined

Applicant: RICHA P PANDHI · Owner: H STREET NE OWNER LLC

Issued Aug 28, 2026
DC-ER2601978
PERMIT ISSUED

Building permitelevator - repair

Replace escalator controller with direct replacement escalator controller. New controller to retain existing code compliance, function, and fixtures. Existing code year to be retained.

Applicant: JOSEPH DOWLING · Owner: H STREET NE OWNER LLC

Issued Jul 14, 2026
DC-E2609430
PERMIT ISSUED

Building permitelectrical

Owner: H STREET NE OWNER LLC

Issued Jun 3, 2026
DC-SG2600154
PERMIT ISSUED

Building permitsign

Install 1 New Wall Mounted Sign Illuminated. Install 2 New Blade Sign Illuminated. "Club Studio"

Applicant: LAURA MERCIER · Owner: H STREET NE OWNER LLC

Issued Jun 2, 2026
DC-D2600187
PERMIT ISSUED

Building permitdemolition

Work consists of demolition of existing furniture, fixtures, finishes from former office work space, in preparation for future New Work for a future tenant in the space. All work for future fitness tenant to be submitted under separate cover. All work to be Internal to (2) existing, adjacent buildings which share a connection through an existing 3hr fire wall along the property line. The larger building is an existing 8 story plus rooftop amenity area, IIA residential, mixed-use building permitted and constructed between 2015 and 2017. The smaller building is a IIB, 3 story plus rooftop amenity structure permitted and constructed in 2017. The demo work in the larger building will occur on the 2nd floor, while the smaller building will have demo work on all floors, including the roof.

Applicant: DFM PERMITS · Owner: H STREET NE OWNER LLC

Issued Mar 6, 2026

Property record

SSL 0858 0866
Lot
101,096 sq ft
Assessed
$141,681,690
Land / improvements
$20,391,060 / $121,290,630

Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.

What this page cannot show

These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.

DC building
current to Sep 21, 2026
← Browse all permitsSearch this address in the feed →