WASHINGTON, DC 20011 · DC — Ward 4
Building permit — alteration and repair
DGS Project. Install new generator and associated electrical equipment exterior to the existing building. Install underground ductbank, connecting new equipment to existing building electrical room.
Applicant: PHILIP ANDERSON · Owner: DISTRICT OF COLUMBIA
Building permit — alteration and repair
THIS IS A REVISON TO APPROVED PERMIT B2506450. - Install the new RTU and connect it to the existing ductwork in the building - Installation of new inline duct heat coil unit - Install a new electrical feed to power the new unit - Install of new BAS system.
Applicant: NNEKA SHELTON · Owner: DISTRICT OF COLUMBIA
Building permit — alteration and repair
The new work includes the alteration and repair to the main police stations two (2) exterior communication towers (700 and 400) to be demolished and replaced with one (1) new 500 tower, electrical upgrades to the panelboards in main buildings basement, new temporary exterior guard booth, and demolition of an unoccupied support building under the 400 tower.
Applicant: DISTRICT OF COLUMBIA · Owner: DISTRICT OF COLUMBIA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.