ROCKVILLE, MD, 20852 · Montgomery County
Building permit — commercial building
Interior work only,RENOVATION FOR A SPEC NEW SUITE, INCLUDE SELECTIVE CONSTRUCTION AND DEMO OF PARTITIONS, CEILINGS AND MILLWORK. NEW FINISHES,LIGHTING FIXTURES,ELECTRICAL, PLUMBING WORK
Building permit — commercial building
Systems Furniture
Building permit — commercial building
THE WORK CONSISTS OF NEW CONSTRUCTION FOR A NEW OFFICE TENANT. THE EXISTING SUITE CONDITION IS A FULLY BUILT OUT OFFICE SPACE. NEW WORK WILL INCLUDE COMPLETE CONSTRUCTION OF PARTITIONS, CEILINGS AND MILLWORK AS SHOWN IN THE PLANS. THE SUITE SHALL RECEIVE NEW FINISHES. NEW LIGHTING FIXTURES WILL BE PROVIDED. NEW ELECTRICAL WORK WILL BE DONE. NEW PLUMBING WORK SHALL BE DONE. EXISTING MECHANICAL SYSTEMS SHALL BE MODIFIED AND NEW COMPONENTS PROVIDED TO SUPPORT THE NEW BUILD-OUT AS REQUIRED. EXISTING LIFE SAFETY SYSTEMS SHALL BE MODIFIED AND NEW COMPONENTS PROVIDED TO SUPPORT THE NEW BUILD OUT AS REQUIRED.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.