WASHINGTON, DC 20032 · DC — Ward 8
Building permit — permit
Building permit — civil plans
The work under this permit includes the installation of a recreational turf field and drainage system for use by King Elementary School located at 3200 6th Street SE. The work includes installation of a 4" perforated PVC underdrain per DOEE standards and a 12" drain basin
Applicant: C/O MCN BUILD · Owner: UNITED STATES OF AMERICA C/O MCN BUILD
Building permit — alteration and repair
The scope of work includes the addition of exterior site utilities, finishes, features, and equipment for a new splash pad to be delivered with the new recreation center under separate permit B2600823. Area affected under this permit application 900 SF
Applicant: DAN WILLIAMS · Owner: UNITED STATES OF AMERICA
Building permit — electrical
Owner: UNITED STATES OF AMERICA
Building permit — mechanical
Owner: UNITED STATES OF AMERICA
Building permit — plumbing and gas
Owner: UNITED STATES OF AMERICA
Building permit — plumbing and gas
Owner: UNITED STATES OF AMERICA
Building permit — electrical
Owner: UNITED STATES OF AMERICA
Building permit — new building
NEW CONSTRUCTION OF RECREATION CENTER - EXTERIOR ENVELOPE AND INTERIOR PARTITIONS, FINISHES AND EQUIPMENT FOR THE NEW RECREATION CENTER. THIS SCOPE ALSO INCLUDES ALL NEW MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS FOR THE BUILDING AND ALL NEW SITE ELEMENTS INCLUDING PLAYGROUNDS. ATHLETIC FIELD TO BE PERMITTED UNDER SEPARATE COVER. PROPOSED GROSS FLOOR AREA 17,484 FOUNDATION TO GRADE UNDER SEPARATED ISSUED PERMIT FD2500021
Applicant: LILLY HOCHHAUSER; GCS, INC. · Owner: UNITED STATES OF AMERICA
Building permit — permit
Building permit — plumbing and gas
Owner: UNITED STATES OF AMERICA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.