WASHINGTON, DC 20001 · DC — Ward 2
Building permit — addition alteration repair
Remove old shingles from the sloped section on the main roof and replace with new architectural shingles. Remove old flat roof sections on the main roof and replace with Fibertite roof membrane. Remove old metal built in gutter liner on around the front turret and replace with Fibertite Fiberclad metal roof. Replace all aluminum gutters and downspouts around the building.
Applicant: GERARDO PEREZ · Owner: BISHOP S.C.MADISON, TRUSTEE
Building permit — demolition
Interior demolition in selected areas of existing office. No structural elements removed.
Applicant: ADAM CRAIN · Owner: BISHOP S.C.MADISON, TRUSTEE
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.