WASHINGTON, DC 20003 · DC — Ward 6
Building permit — miscellaneous
This project involves the construction and installation of a new steel canopy over the existing escalator entrance at the Potomac Avenue Metro Station as approved under DOB permit B2604228. Activities are to be performed overnight, during WMATA non-revenue hours 12am-5am, Mon-Sat as approved by ANC Commissioner
Applicant: COMAN ILAHI · Owner: WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA)
Building permit — alteration and repair
This project involves the construction and installation of a new steel canopy over the existing escalator entrance at the Potomac Avenue Metro Station. The canopy base will be secured to the parapet wall surrounding the station. Key installation activities include temporary fencing, erecting a work platform, crane use for placing canopy sections, and skylight framing with glass panel installation.
Applicant: COMAN ILAHI · Owner: WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA)
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.