BETHESDA, MD, 20817 · Montgomery County
Building permit — building residential permit
Building in-ground pool/spa per county approval
Right-of-way permit — public right of way
Install water house connection in accordance with WSSC permit (sc-), plans and specifications. WSSC to install a new water connection. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. Any and all adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way including haul route caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site.
Building permit — building residential permit
Proposed Single Family Dwelling in Avenel Community.Customer states 9644sf Finished. 11,670sf with gar, cvrd prchs, unfinish space.
Building permit — building residential permit
Two planter box retaining walls to be built in rear left side of new home.
Right-of-way permit — public right of way
Place underground conduit by directional boring and pull cable in accordance with Pepco plan (WO20756631). DIRECTIONAL BORE AND INSTALL SECONDARY SERVICE CABLES TO 200AMP TEMP METERSOCKET. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. All adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way, including haul route, caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site.
Right-of-way permit — public right of way
Install gas service in accordance with Washington Gas permit No. 1067741. INSTALL SERVICE. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way, including haul route, caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.