TAKOMA PARK, MD, 20912 · Montgomery County
Building permit — building residential permit
Demo first floor and second floor windows for repair. demo existing basement windows for replacement. demo existing rear wooden stairs to reconstruct. repair or replace front porch and front porch roof components as needed paint exterior walls and trim to blend with existing
Building permit — building residential permit
Interior work only,1-DEMO WALLS AS SHOWN. DEMO PLUMBING FIXTURES. 2- DEMO LOAD BEARING WALLS INSTALL NEW HEADERS. 3-CONSTRUCT NEW WALLS, POWDER ROOM AND KITCHEN. 4-NO EXTERIOR WORK TO BE DONE.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.