WASHINGTON, DC 20019 · DC — Ward 7
Building permit — alteration and repair
Scope of WorkInterior renovation of the existing residential property, including demolition and installation of new finishes as required.Renovation of the existing kitchen and existing bathroom, including associated plumbing, electrical, cabinetry, fixtures, finishes, and related improvements.Construction of one (1) new bedroom and one (1) new bathroom within the existing basement level.Relocation of the existing furnace and completion of all associated mechanical modifications required for the proposed layout.Creation of a new opening for installation of one (1) double-hung window measuring approximately 30 x 52 at the basement level, including all required framing, structural modifications, and finish work.Completion of all required framing, insulation, drywall, flooring, painting, plumbing, electrical, and mechanical work necessary to complete the proposed renovations.All work shall be performed in accordance with applicable building codes, permit requirements, and approved construction plans.
Applicant: MARITZA BENITEZ · Owner: BNB VENTURE INC
Building permit — fence
Replacement of 4ft fence on property.
Applicant: MARITZA BENITEZ · Owner: BNB VENTURE INC
Building permit — alteration and repair
Shingle roof replacement and replacement of front/back exterior door
Applicant: MARITZA BENITEZ · Owner: BNB VENTURE INC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.