WASHINGTON, DC 20001 · DC — Ward 2
Building permit — solar system
Historic- REVISED PERMIT for SOL2601820 : INSTALLATION OF A PV ROOF MOUNTED SOLAR SYSTEM WITH A CAPACITY OF 37.84 kW DC / 34.6 kW AC. THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT (PEPCO). THE SYSTEM CONSISTS OF 86 SERAPHIM 440W SRP-440-BTD-BG MODULES, EACH WITH A CAPACITY OF 440 W (P+++)
Applicant: STEVEN G STAHL · Owner: 801 P STREET NEW HOPE COOPERATIVE INC
Building permit — electrical
Owner: 801 P STREET NEW HOPE COOPERATIVE INC
Building permit — solar system
HISTORIC INSTALLATION OF A PV ROOF MOUNTED SOLAR SYSTEM WITH A CAPACITY OF 43.2 kW DC / 34.6 kW AC. THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT (PEPCO). THE SYSTEM CONSISTS OF 96 TALESUN BIPRO PANELS, MODEL TM7G54M-450W, EACH WITH A CAPACITY OF 450 W (P+++)
Applicant: STEVEN G STAHL · Owner: 801 P STREET NEW HOPE COOPERATIVE INC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.