WASHINGTON, DC 20002 · DC — Ward 6
Building permit — addition alteration repair
HISTORIC Revision to permit B2602815: Minor layout changes to Unit 102: Edits to area where stairs connect first floor and cellar within Unit 102. Edits to bedrooms and bathroom layouts on 2nd and 3rd floor. Minor change to footprint of building where rear wing and the main front mass of building meet.
Applicant: ADAM CRAIN · Owner: 807 DMA LLC
Building permit — addition alteration repair
Revision to B2509954: Change 6 units to 4 units. Cellar: Right side to remain unexcavated. Underpin removed. Window wells added on the left side. First floor: Closets shown where the stairs to the cellar were before. 2nd and 3rd floors: No change.
Applicant: ADAM CRAIN · Owner: 807 DMA LLC
Building permit — mechanical
Owner: 807 A ST NE
Building permit — plumbing and gas
Owner: 807 DMA LLC
Building permit — plumbing and gas
Owner: 807 DMA LLC
Building permit — electrical
Owner: 807 DMA LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.