WASHINGTON, DC 20011 · DC — Ward 4
Building permit — alteration and repair
Remove existing concrete stairs Remove concrete walkway Remove wood fence and attached gate Remove or add or manipulate dirt as needed to level area and prepare for new parking pad and retaining wall installation Install 8 concrete steps Install new handrail for the replaced exterior stairs Install concrete walkway Install new concrete parking pad.
Applicant: STEPHENS, ANWAR N · Owner: YOUNGER, MELANIE
Building permit — retaining wall
Dig to create new reinforced concrete footing 24 inch wide x 12 inches deepInstall 42 inch total length of new, reinforced cinder block retaining wall filled with concrete, with backside drainageFinish walls with stucco for smooth finish
Applicant: STEPHENS, ANWAR N · Owner: YOUNGER, MELANIE
Building permit — fence
Install new fence with pressure treated wood plus a new gate, on top of back of masonry wall
Applicant: STEPHENS, ANWAR N · Owner: YOUNGER, MELANIE
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.