WASHINGTON, DC 20005 · DC — Ward 2
Building permit — electrical
Owner: 925 15TH ST LLC
Building permit — electrical
Owner: 925 15TH ST LLC
Building permit — alteration and repair
HISTORIC Interior alteration of SPEC Ste 500, to include MEP and Fire. No structure changed. FAST TRACK.
Applicant: THUY LE / CHRIS VU · Owner: 925 15TH ST LLC
Building permit — alteration and repair
HISTORIC THE SCOPE OF WORK REPRESENTED ON THESE DRAWINGS HAS BEEN PROVIDED IN ORDER TO RENOVATE THE 3RD FLOOR FOR A SPEC SUITE 300, APPROXIMATELY 2,966 SQUARE FOOT RENOVATION. SCOPE OF WORK INCLUDES DEMOLITION OF EXISTING CONDITIONS, INCLUDING THE RESTROOMS, NEW PARTITIONS, ELECTRICAL, CEILING/LIGHTING, PLUMBING FIXTURES, FINISHES AND MODIFICATIONS OF THE EXISTING HVAC SYSTEM. GC TO FURNISH LABOR, MATERIALS, TOOLS, EQUIPMENT, AND SERVICES FOR WORK AS INDICATED OR INFERRED BY THE DOCUMENTS TO COMPLETE TO DESIGN INTENT. GC SHALL COMPLETELY COORDINATE WORK AND SHALL ASSUME THE BURDEN OF ADDITIONAL COST IF SEQUENCING RESULTS IN WORK HAVING TO BE REMOVED OR IF HIS COSTS INCREASE BECAUSE OF POOR SEQUENCING OF WORK. CONTRACTOR RESPONSIBLE FOR INCIDENTAL LOCAL JURISDICTION'S INTERPRETATIONS OF INTERNATIONAL BUILDING CODE. TENANT WORK TO BE PROVIDED UNDER SEPARATE SUBMISSION. NO STRUCTURE CHANGED. ---FAST TRACK.
Applicant: THUY LE / CHRIS VU · Owner: 925 15TH ST LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.